This project documentation is available through CERN EDMS system.
| 
 Project documentation  | 
|
| Safety file | Insulation coordination | 
| Design reports | |
| 
 Power diagram  | 
|
| Power stack | |
| 18kV cast-resin transformer | |
| DC reactor | |
| 
 Medium-voltage DC film capacitors  | 
Specification Design Test reports | 
| Resistors | |
| Medium-Voltage Load Resistors | Specification | 
| 
 Medium-voltage electronic voltage transducer  | 
Specification Design Test reports | 
| 
 Mechanical switches  | 
|
| Medium-voltage AC current transformers | Specification Design Test reports | 
| Medium-voltage fuse link | |
| 
 Discharge contactor  | 
|
| AC Voltage Detection System | VDS manual and datasheets | 
| 
 RegFGC3 electronics  | 
|
| VS _Conditionning Box | Specification Production folder | 
| 
 DCCT  | 
|
| 
 MV arc-proof enclosure  | 
 Specification Production folder  | 
| Integration & cabling | Specification Production folder | 
| Tests | 
 Electrical-arc flash fault Type and routine  | 
| Operation | 
 Operation manual Circuit breaker settings (18kV - 400V)  | 
| 
 Installation  | 
Studies on SYRACUSE Handling and Transport in A7 | 
| PSIM model | 
      
  
  
  English