PSB Transfer Bendings Upgrade
Objective
Currently the magnets in the BT, BTP and BTM beam lines, transferring the particles from Proton Synchrotron Booster (PSB) ring towards Isotope Separator On Line Device (ISOLDE) and Proton Synchrotron (PS) facilities and as well as in PSB ring are used for bending and focusing the beams with energies of 1.4 GeV. An upgrade of PSB complex to reach the energies of 2 GeV in the framework of the LIU-PSB project and Work Unit Provide Transfer Bendings (WU 91574) requires replacement of both magnets and their powering solutions.
The new power converters belong to a SIRIUS converter family and are to be installed during Long Shutdown 2 (LS2).
Project team
- EPC responsible: Ivan Josifovic
- LIU linkman: Serge Pittet [all LIU linkmen]
- Team members: Frederic Daligault
Documentation
EDMS folder |
|
Project management | GDPM planning EVM planning EVM inputs |
Meetings | .edms |
Technical specifications |
|
Equipment list | .edms |
Infrastructure docs |
|
Engineering tools |