2GeV PSB-TL

PSB Transfer Bendings Upgrade

Objective 

Currently the magnets in the BT, BTP and BTM beam lines, transferring the particles from Proton Synchrotron Booster (PSB) ring towards Isotope Separator On Line Device (ISOLDE) and Proton Synchrotron (PS) facilities and as well as in PSB ring are used for bending and focusing the beams with energies of 1.4 GeV. An upgrade of PSB complex to reach the energies of 2 GeV in the framework of the LIU-PSB project and Work Unit Provide Transfer Bendings (WU 91574) requires replacement of both magnets and their powering solutions.

The new power converters belong to a SIRIUS converter family and are to be installed during Long Shutdown 2 (LS2).

Project team

Documentation

 

EDMS folder

.edms

Project management GDPM planning
EVM planning
EVM inputs
Meetings .edms

Technical specifications

.edms

Equipment list .edms

Infrastructure docs

Pre-ECR
WIC & BIS

Engineering tools

.edms

 